After you mark an inspection complete, Realworks fills in the form with your answers, comments and photos. Review it, then finish it.
Review the form #
- Log in to Realworks and open the form from All Forms. It’s still a Draft.
- Check each page. Your answers and comments are filled in.
- Under Annexures & files, you’ll see Inspection Report.pdf with your photos.

4. The Inspection Details tab shows the status Completed. The inspection date and time are locked.

Finish the form #
| Form | To finish |
| EF071 – Routine Inspection Report | Select Stamp and complete. |
| RTA1ad – Entry Condition Report and RTA14ad – Exit Condition Report | Open Form Actions (⋮) and choose Ready for signing, then send it for signing as usual. |

Good to know #
- To save a copy, open Form Actions (⋮) and choose Download.
- On the RTA forms, some items you recorded separately are combined into one row, for example Doors/walls/ceiling.