Review and finish the form in Realworks

After you mark an inspection complete, Realworks fills in the form with your answers, comments and photos. Review it, then finish it.

Review the form #

  1. Log in to Realworks and open the form from All Forms. It’s still a Draft.
  2. Check each page. Your answers and comments are filled in.
  3. Under Annexures & files, you’ll see Inspection Report.pdf with your photos.

4. The Inspection Details tab shows the status Completed. The inspection date and time are locked.

Finish the form #

FormTo finish
EF071 – Routine Inspection ReportSelect Stamp and complete.
RTA1ad – Entry Condition Report and RTA14ad – Exit Condition ReportOpen Form Actions (⋮) and choose Ready for signing, then send it for signing as usual.

Good to know #

  • To save a copy, open Form Actions (⋮) and choose Download.
  • On the RTA forms, some items you recorded separately are combined into one row, for example Doors/walls/ceiling.

Related articles #